Design, Supply, Deliver and Installation of Wind Measurement Meteorological Mast (Met Mast) for a Wind Power Project in Albay, Philippines
Posted: 3 October 2024
Pacific Impact Energy Corp. (Company) would like to invite firms to submit proposals to perform design, supply, deliver and installation of wind measurement meteorological mast (Met Mast) for a wind power project in Albay, Philippines.
After receipt of the Expression of Interest (EOI) and execution of a non-disclosure agreement (NDA), the terms of reference and associated documents will be provided to qualified contractors. Contractors are encouraged to include Philippines-specific project references in their submission; failure to do so may result in disqualification. Only contractors meeting the qualification criteria will be contacted.
The Expression of Interest period will close on 10 October 2024.
Following a review of qualifications and relevant project experience, shortlisted contractors will receive the Request for Proposal (RfP) and Terms of Reference.
Interested parties should send their Expression of Interest to procurement@pacificimpactdevelopment.com.
Share this post: