Geotechnical Study for a Solar Power Plant in Cambodia

Posted: 9 February 2024

SPIRE Cambodia Holdings Pte Ltd (“Company”) – on behalf of Pacific Impact Development (“Pacific Impact”) and Sustainable Pacific Impact Renewable Energy Pte Ltd (“SPIRE”) – would like to invite your firm to submit proposals to perform a Geotechnical Study for a Solar Power Plant in Cambodia.

The Company has been formed and incorporated as a special purpose company and has the following shareholders:  

    • Pacific Impact Development Pte. Ltd. (www.pacificimpactdevelopment.com); and  
    • Sustainable Asia Holdings Pte. Ltd. (www.susi-partners.com)  

The geotechnical study will cover the following key areas, but not limited to: 

    • Investigation about the geology, hydrogeology of the proposed construction site. 
    • Performing, drilling, boreholes, taking soil samples. 
    • Performing standard penetration tests. 
    • Conducting the laboratory testing. 
    • Performing chemical analysis. 
    • Preparing the technical report. 
    • Compiling the final report. 
    • Summarizing the recommendations  
    • Other work as deemed necessary by the supplier 

After receipt of the Expression of Interest (EOI) and execution of a non-disclosure agreement (NDA), the terms of reference and associated documents will be provided to qualified advisors. Interested advisors should include their Cambodia project references with the Expression of Interest. Failing to do so may result in disqualification, only qualified contractors will be contacted. 

The Expression of Interest period will close on February 16, 2024

The Request for Proposal (RfP) and Terms of Reference will be sent to shortlisted advisors after review of their qualifications and relevant project references. 

For interested parties, you can contact us and send an email to procurement@pacificimpactdev.com