Desktop Review of the Unexploded Explosive Ordinance (UXO) for a Solar Power Plant in Cambodia

Posted: 10 January 2024

SPIRE Cambodia Holdings Pte Ltd (“Company”) – on behalf of Pacific Impact Development (“Pacific Impact”) and Sustainable Pacific Impact Renewable Energy Pte Ltd (“SPIRE”) – would like to invite your firm to submit proposals to perform a Desktop Review of the Unexploded Explosive Ordinance (UXO) for a Solar Power Plant in Cambodia.

The Company has been formed and incorporated as a special purpose company and has the following shareholders:  

  • Pacific Impact Development Pte. Ltd. (www.pacificimpactdevelopment.com); and  
  • Sustainable Asia Holdings Pte. Ltd. (www.susi-partners.com)  

The review aims to: 

  • Conduct an in-depth Unexploded Explosive Ordnance (UXO) Desk Review to comprehensively assess historical documentation, survey records, and other available data pertaining to UXO presence on specified sites. The aim is to provide a detailed analysis and evaluation of potential UXO risks based on historical activities and potential ordnance deposition.
  •  Identify and delineate specific risk areas within the designated sites, mapping out potential locations of UXO contamination based on the collected historical data. This objective aims to pinpoint areas where further investigation or remediation may be required, ensuring safety and risk mitigation during subsequent site activities. 
  •  Recommend risk mitigation strategies and potential UXO management plans based on the identified risk areas. This includes suggesting approaches for UXO clearance, if necessary, and providing guidance on safety protocols to minimize hazards during site development or construction activities. 

After receipt of the Expression of Interest (EOI) and execution of a non-disclosure agreement (NDA), the terms of reference and associated documents will be provided to qualified advisors. Interested advisors should include their Cambodia project references with the Expression of Interest. Failing to do so may result in disqualification, only qualified contractors will be contacted. 

The Expression of Interest period will close on January 19, 2024. 

The Request for Proposal (RfP) and Terms of Reference will be sent to shortlisted advisors after review of their qualifications and relevant project references. 

For interested parties, you can contact us and send an email to procurement@pacificimpactdevelopment.com

Share this post:

Facebook
LinkedIn